During 2015 the crane barge was upgraded with a 12-person accommodation module for the marine crew. A forecastle was built with sewage system, port and emergency power generators, paint-room and workshop. An 8-point mooring system was installed with 4 double drum winches outfitted with disc brakes, fairleads, and tension meters.
1. Installation for Ceona Amazon in Rotterdam for Rotterdam Offshore Group
2. Loading and transportation of Ferry St. Johannes (250t) from Rotterdam to Brunsbuttel (Germany)
3. Upgrade with forecastle, accommodation and 8-point mooring system
4. Salvage of centuries-old sailing vessel, in Germany
5. Sailing back from Eemshaven to Amsterdam for her next job







