Pile installation for floating dry dock

Pile installation for floating dry dock

Port Said Shipyard decided to expand and install a new 35,000t capacity floating dry dock, ‘Fakhr Al Qanah’. In preparation for its arrival, Canal Harbour and Great Projects Co. CHP (Affiliate to Suez Canal Authority) awarded the pile installation project...
Sagunto jetty – removal of jetty infrastructure

Sagunto jetty – removal of jetty infrastructure

The Sagunto jetty, more than 1100m in length, was built in the mid 70’s by the Mining Company of Sierra Menera and continued to operate as a dock for vessels until 2009. In 2022, after years of deterioration while idle, the Valencia Port Authority deemed it...
Nuclear powerplant – installation of subsea pipes & culverts

Nuclear powerplant – installation of subsea pipes & culverts

The Akkuyu nuclear powerplant (Turkish: Akkuyu nükleer güç santrali) is a nuclear power plant under development, at Akkuyu, in Büyükeceli, Mersin Province, Turkey. It will be the country’s first nuclear powerplant, comprising four 1,200 MW VVER units. The...
Dry dock 5 year renewal

Dry dock 5 year renewal

After a long period of work all over the Western hemisphere, the Conquest MB1 needed a 5-year renewal of Class. In the midst of the corona pandemic, our people did a great job in guiding the crane barge through a well-deserved and very successful dry docking in the...
Dry dock refloating

Dry dock refloating

In July 2019, the Conquest MB1 was contracted to refloat a 982 feet (300m) long by 228 feet (70m) wide 25,000t dry dock that had suffered irreversible structural failure and flooding during the docking of a large cruise ship. The engineering team of Resolve Marine...