Conquest MB1 upgrade and various jobs

In 2015 the Conquest MB1 had various heavy lift jobs in Rotterdam, Eemshaven, The Netherlands and in Brunsbuttel, Germany.

During 2015 the crane barge was upgraded with a 12-person accommodation module for the marine crew. A forecastle was built with sewage system, port and emergency power generators, paint-room and workshop. An 8-point mooring system was installed with 4 double drum winches outfitted with disc brakes, fairleads, and tension meters.

1. Installation for Ceona Amazon in Rotterdam for Rotterdam Offshore Group
2. Loading and transportation of Ferry St. Johannes (250t) from Rotterdam to Brunsbuttel (Germany)
3. Upgrade with forecastle, accommodation and 8-point mooring system
4. Salvage of centuries-old sailing vessel, in Germany
5. Sailing back from Eemshaven to Amsterdam for her next job

CLient

No client logo found.

Project specifications

Client

N/A

Location

Multiple locations

Duration

N/A

Weights

250t

Scope

Installation, loading and transportation, upgrades and salvage

Location

54°54'21.38"N | 4°29'08.61"E

Clients & partners